logo
ITA   ENG
Commercial, industrial and business buildings

PALAZZINA 4WD - FERRARI

Location:

Maranello (MO)

Client:

Ferrari S.p.A.

Construction period:

2023 - 2024

Contract amount:

€ 7.000.000,00

Contractor:

Ediltecno Restauri s.r.l.

Designer:

Archilinea s.r.l. - Periti Industriali : Andrea Perini - Paolo Scuderi

PALAZZINA 4WD - FERRARI
The new building to be built will be completely located on an area owned by Ferrari S.p.A., precisely within an area located to the east of the building called 4WD, on the currently asphalted square; Works will be necessary to move pre-existing systems (petrol tank and necessary systems, sewage networks, multi-service block; well, fire prevention pipes, etc...);

The activities that will take place will be the following:

Interfering plant movements;
1a. execution of Berlinese
Excavate up to a depth of 240 cm;
slab foundation of approximately 110cm
strong masonry and pillars
supply and installation of hollow core slabs
beams
execution of stair ramps
installation and dismantling at the end of the structural scaffolding activities
installation of fixtures
construction of mechanical systems
construction of electrical systems, data, etc...
construction of fire prevention systems
creation of even coverage with insulators and hot sheaths

This construction will involve a series of related operations, such as the execution of excavations and the execution of Berliners for the repositioning of polyfers for plant service and the relocation of existing sewerage networks. All the construction and expansion works of an industrial building are foreseen with metal and wooden carpentry works, installation of floors, systems and finishes.
PALAZZINA 4WD - FERRARI
PALAZZINA 4WD - FERRARI
PALAZZINA 4WD - FERRARI
PALAZZINA 4WD - FERRARI
PALAZZINA 4WD - FERRARI